PROJECTS

Aitik 36

(Boliden)

The largest copper mine of Europe located in the extreme cold of the Swedish North Pole.

CBT supplied all the belts for this great copper project including 9.500 m of a ST 6000 in 2134mm.

CBT, together with RAS, supplied all the pulleys for this project.

CBT was in charge of the sliding of the Overland system with vertical curves using the CBT Belt Clamping System.

The ST 6000 was spliced in record time (18 h for a 6m long splice) with a team made by Swedish, Peruvian, Chilean and Canadian labor.